History

INSTITUTE FOR ADVANCED ENGINEERING

  • 2020-the present

    2023.06.Establishment of the IAE Gangwon Campus (IGC)

    2023.01.Establishment of the IAE Chungcheong Campus (ICC)

    2022.12.Establishment of IAE Vision 2032

    2022.07.30th Anniversary of Institution Establishment
    (Commemoration Ceremony for the Founder of DAEWOO, Chairman Woo-choong Kim)

    2022.03.Designation/Operation of Chemical Industry Forum Secretariat
    (Ministry of Industry)

    Chungju BioGreen Hydrogen Charging Station Completed / Commercial Operation Starts
    (Ministry of Industry Energy Technology Development Project)

    2020.11. Establishment of a Branch Office to carry out Regional R&D Projects
    (Gyeongnam-Wind Power, Ulsan-CCUS, Chungnam-Hydrogen FC Power Generation)

    2020.04.Participated in technical development support agency(KIAT) for materials, components and equipment companies

  • 2010~2019

    2019.05.Initiated Hydrogen production and storage pilot plant EPC projects

    2018.07.Initiated the liquified air energy storage system(LAES) and CCUS technologies development

    2017.08.Initiated the wind power related Technical development and systems engineering

    2016.07.Launch of engineering design for the Supercritical CO2 Power Generation System

    2015.06. Launch of developing strategic industrial materials (TiCl4, TiO2)

    2015.05. Running of task force teams for technology convergence and innovative human resources

    2014.06. The Supercritical CO2 Power System Promotion Division established

    2014.03. IAE VISION 2022 planned

    2014.02. IGCC BSU moved into the IAE

    2013.04. Rare Metal Industrial Technology Research Center(Incheon-Songdo TP) established

    2012.11. The Pilot Plant of Waste Gasification Melting System built

    2012.03. Materials processing center(Resource Recycling) established

    2011.02. 20ton/day IGCC Test-Bed construction launched(~2016)

    2011.10. Natural gas(LNG) manufacturing process BSU built

    2010.09. Waste recycling and rare metal recovery technology development launched

    2010.06. Synthetic natural gas (SNG) manufacturing process BSU Built

  • 2000~2009

    2009.07.MOU for the development of clean coal technology
    (Ministry of Knowledge Economy, POSCO, SK Energy, etc.)

    2007.05.An institution for the calculation of indirect costs rate designated by the governmental R&D
    project(Ministry of Science and Technology)

    2006.02.Affiliation with the Components Integration Research Group supporting SMEs
    (Ministry of Commerce)

    2004.04.ISO 9001: 2000 Quality Management System Certificate obtained(Engineering and Technology)

    2003.03.An institution for the calculation of labor costs designated by the governmental R&D project
    (Ministry of Commerce)

    2002.05.An institution for the calculation of labor costs designated by the governmental R&D project
    (Ministry of Science and Technology)

    2001.08.Three research teams including Precision Technologies designated as National Research
    Laboratories(Ministry of Science and Technology)

    2000.07.Business Incubator designated(SMBA)

    2000.06.Four research teams including Gasification Melting designated as National Research
    Laboratories(Ministry of Science and Technology)

  • 1992~1999

    1999.09.Two research teams including Plasma designated as National Research Laboratories
    (Ministry of Science and Technology)

    1998.07.Project Based System(PBS) introduced and operated

    1995.11.YongIn Research Center established(the IAE relocation)

    1995.03.Integrated Gasification Combined Cycle System(IGCC) BSU built(Ajou University)

    1994.08. Ajou University branch established(IGCC research)

    1992.07. The IAE established(Seoul)